A drawing the shop can actually quote
Provide geometry, tolerances, material, finish, threads and datums. A geometry-only model may omit manufacturing intent, while a model-based definition can include it. Agree which files and revision control the order.
Which tolerances you actually need
The responsible engineer should identify every functionally required tolerance and appropriate general requirements elsewhere. There is no universal count of critical dimensions or guaranteed saving from relaxing one.
Material grade and its certificate
Specify the exact grade, standard and condition, with substitutions subject to engineering approval. Require the agreed material evidence linked to the supplied heat or batch; a grade name alone is insufficient.
Surface finish and treatment
Specify machining finish and every required surface treatment, including which dimensions are assessed before or after treatment. Coating and surface-preparation effects must be considered for fits and function.
First article before the run
Agree a first-article plan, measured features, methods, records and release criteria before production. Dimensional acceptance does not automatically establish material performance or service life.
Inspection equipment the shop actually has
Ask how the shop will verify each required feature, including suitable instruments, calibration, method and acceptance decisions. Owning a CMM or caliper alone does not prove measurement capability.